Winner of the ECCE App Challenge 2026 by our team MACorridors

In this post, I’ll be providing a brief overview on the app Highway_EA (or link directly to the app here) and providing some behind-the-scenes on the components that I was responsible for during the competition in Spring 2026. First off I would like to acknowledge and thank my awesome MACorridors teammates Amber Chanthavong and Nolyn Lakhanpal without whom this would not have been possible. More extensive documentation can be found on the app’s Github page.

Overview and Mission

Highway_EA (Figure 1) was created with the growing transportation demand in Southern Ontario in mind, for which the proposed Highway 413 has become a hot button issue because its promise of alleviating congestion and improving connectivity comes at the cost of environmental impacts where it is built. The tool to evaluate this is the Environmental Assessment (EA) but these tend to not be accessible to the public due to being lengthy and technical. We set about creating an app that can present similar information, about the impacts of roads and highways, in a visual, interactive way using publicly available data. Our mission is to (1) demonstrate the impact of major highways in the context of long term sustainability, and (2) make Environmental Assessments more accessible to all Ontarians so that they can better understand the issue for themselves, should they wish to take action and influence policy.

(1) Learn: The app presents a StoryMap of Highway Impacts, outlining the drawbacks in long-term sustainability and ecosystem diversity despite the need and benefits of such projects. Highway 413 is outlined, giving users the history, purpose and details about the project. This learn page is intended to give background and context to an unfamiliar user.

(2) Visual Assessment: This map allows users to view the key areas of impact around the project along with relevant statistics, summaries and information. The map outlines the three key impact categories assessed for in the EIA: Natural Environment, Social and Economic Development, and Cultural Environment. This module is what we will be discussing in more detail in this post.

(3) Sketcher: Highway_EA also allows the user flexibility to try out alternative transportation routes themselves with the Sketcher tool, where they can draw a highway or larger footprint and see roughly how much impact it might have.

(4) Action Hub: The purpose of this page is to provide users with actionable ways to advocate for and bring their concerns to the relevant channels; both governmental and through conservation authorities.

Figure 1: Home page of Highway_EA

Visual Assessment

Each tab in the Visual Assessment is set up so you are greeted by the proposed Highway 413 footprint, with each of its segments classified by its estimated area of impact across different domains: Hydrology, Habitats, Species at risk, Agriculture and Culture. To put the proposed highway into proper context, you can compare these impacts to those of Existing Highways in Southern Ontario, based on the Ontario Road Network (ORN). You can also turn on the underlying layers of interest, such as Wetlands, to see how their distribution compares visually and to learn more about them and what makes them important features.

Figure 2: Splash page with instructions for the Visual Assessment module.

Hydrology

The Hydrology tab by default starts with a few of the Highway 413 footprint visualized based on the area of wetlands each segment will potentially impact based on a 200 m buffer. From there, you can toggle on the wetlands impacted by existing highways and move onto comparable analyses based on streams and waterbodies. You can see the hydrological features for yourself, which are sourced from the Canadian National Wetland Inventory (CNWI) for wetlands, and the Ontario Hydro Network (OHN) for streams and waterbodies. The user can click on these features to see their name (if applicable) and learn more about that particular type of hydrological feature and how they may be impacted by the highway construction based on the scientific literature (Figure 3).

Figure 3: Hydrology tab of the Visual Assessment module.

Habitats

In the Habitats tab, you are once again greeted by the Highway 413 but now it is visualized based on the area of critical habitat for federally designated species at risk it will impact based on a buffer of 120 m. The Critical Habitats layer featured here is filtered by the species common name chosen in the drop-down menu so you can view habitats of different species of interest and learn more about them in the sidebar when clicked. These habitats are from the Critical Habitat for Species at Risk National Dataset – Canada which comprises the areas important to terrestrial species under the federal Species at Risk Act (SARA). Also of interest in this tab are Protected Areas, defined by the Canadian Protected and Conserved Areas Database. These are areas such as national, provincial parks and conservation areas whose purpose are, at least in part to protect the ecosystems and species found within them. Clicking on highway segments will tell you how many species and how much Protected Area the proposed highway stands to impact, and clicking on the Protected Areas will provide a brief profile of the type, jurisdiction and size (Figure 4).

Figure 4: Habitats tab of the Visual Assessments module.

Species at risk

The Species at risk tab pertains to Provincially Tracked Species, which concerns 1811 species of conservation concern whose presence data is stored as 1 km grids. The Highway 413 and Existing Highway footprints summarize how many are impacted within 120 m of each segment (Figure 5), while the grid system of observed presences can be viewed to look for hotspots of biodiversity.

Figure 5: Species at risk tab of the Visual Assessment module.

Agriculture

Shifting more towards impacts that may be of more immediate concern to humans, the Agriculture tab quantifies how much fertile farmland or Prime Agricultural Area will be within 120 m of the proposed Highway 413, or is currently impacted by existing highways. Clicking on the plots of land also informs the user about this agricultural classification and the impact of urbanization on farmland more generally (Figure 6).

Figure 6: Agriculture tab of the Visual Assessment module.

Culture

Lastly, the Culture tab speaks to green spaces that are important to Ontarians, as Natural Heritage Areas, and evaluates the potential impact of Highway 413 on these lands of significant ecological and cultural value (Figure 7). Additionally, the user can view and learn more about the two major watersheds that stand to be affected by the construction: the Credit River and Humber River watersheds.

Figure 7: Culture tab of the Visual Assessment module.

Methods

As each of these tabs were laid out similarly, the geoprocessing that occurred behind the scenes was all fairly similar in ArcGIS Pro: Pairwise Clip to clip datasets to the region of interest (Greater Golden Horseshoe), Pairwise Buffer to estimate the area of impact of the proposed Highway 413 and existing highways, Pairwise Intersect to quantify the features impacted and Joins to link them back. These datasets were then uploaded to ArcGIS Online to be featured in the app developed in ArcGIS Experience Builder.

It was a privilege to participate in my fourth and final ECCE App Challenge during my Ph.D program at McMaster University, and an even greater honour to represent McMaster as the winning team this year. Each one has been a valuable (if not a bit stressful) learning experience that I would recommend to any GIS student who has the opportunity.